Fall Line Trail

From Wikipedia, the free encyclopedia
Fall Line Trail
(Under Development)
Length43 mi (69 km)
LocationCentral Virginia
TrailheadsAshland, Virginia
Bryan Park, Richmond[1]
Petersburg, Virginia
UseMulti-use, Walking, cycling

The Fall Line Trail (FLT) is an approximately 43 mile [2] multi-use trail currently under development — from a northern terminus in Ashland, Virginia to a southern terminus in Petersburg, Virginia.

Early in its development, the trail had been identified as the Ashland to Petersburg Trail (ATP), and was formally renamed when the state of Virginia broke ground on the trail in October, 2020.[3] Anticipated to serve as a recreational and commuter spine for Central Virginia,[4] the trail has no formal scheduled completion date, as of mid-2021.[5]

Running roughly north-south, the trail is projected to cross Chesterfield, Hanover and Henrico counties, the cities of Colonial Heights, Petersburg and Richmond, and the Town of Ashland — and will cross the Chickahominy, the James and Appomattox Rivers.[2]

Connectivity and design

[edit]

Depending on the final corridor, the trail is projected to connect 24 public schools, four colleges and universities, two community colleges as well as the 3.2 mile Appomattox River Trail near Petersburg.[5] In the city of Richmond, the trail is projected to directly cross the Richmond Canal Walk and the 52 mile, roughly east-west, Williamsburg-to-Richmond Virginia Capital Trail (VCT). In other localities it will connect existing and planned infrastructure, including the Ashland Trolley Line Trail, Chester Linear Park, Trolley Line Connector (Henrico), Brook Road protected bike lanes (Richmond), and the Northern Jefferson Davis Special Area Plan (Chesterfield).[6] At the James River, the trail may cross at the T. Tyler Potterfield Memorial Bridge, a former dam that reopened in 2016 as a predominantly pedestrian bridge.[7]

In contrast to the Virginia Capital Trail, which primarily crosses rural areas, the Fall Line's route is projected to cross urban, suburban, and rural areas.[6] Like the Capital Trail, extensive wayfinding and signage will identify the trail, which is projected to include a separation from vehicular lanes.[6]

Development

[edit]

The trails earliest advocates included Bike Walk RVA, an organization that worked with the officials, municipal staff, other advocates, and volunteers to advance the concept. Subsequently, the trail has developed as a collaborative effort in cooperation with the Virginia Department of Transportation (VDOT), the seven localities, the Crater Planning District Commission, and PlanRVA.[7] In February 2020, VDOT published its study report, identifying stakeholders, case studies of multi-use trails, six possible alignments[7] as well as the preferred corridor for the proposed trail.[8]

As of early 2021, the trail had received approximately $5.7 million in state funding, with a projected cost in the range of $106[2]-192 million (reported variously).[9] and funding coming from transportation funds, local jurisdictions, regional funding and form the Central Virginia Transportation Authority.[2] The trail is projected to cost approximately three times the cost of the Virginia Capital Trail.[5]

In mid-2024, the City of Richmond broke ground on the city's portion of the trail, a thirteen mile segment extending from Bryan Park, which will become a key trailhead, to the Chesterfield County border to the South. By this time, the Fall Line Trail's overall cost was projected at $300M.[1]

See also

[edit]
[edit]

References

[edit]
  1. ^ a b "Richmond's Segment of 43-mile Fall Line Trail Breaks Ground, Connecting Central Virginia". WRIC.com. August 28, 2024.
  2. ^ a b c d Gary Robertson (May 24, 2021). "The Fall Line Trail". Richmond Magazine.
  3. ^ Adriana Hargrove (October 21, 2020). "Name revealed for new 43-mile trail from Ashland to Petersburg". NBC12.
  4. ^ Rich Griset (April 3, 2019). "VDOT begins Ashland to Petersburg trail study". Chesterfield Observer.
  5. ^ a b c Ian M. Stewart (October 21, 2020). "A New Multi-Use Trail Gets Its Name".
  6. ^ a b c Louise Lockett Gordon. "Ashland to Petersburg Trail: A Spine for Regional Transportation". SportsBackers.org.
  7. ^ a b c Wyatt Gordon (October 1, 2019). "Central Virginia is planning a 41-mile trail from Ashland to Petersburg". Greater Greater Washington (.org).
  8. ^ "VDOT Completes Ashland to Petersburg Trail Study". Virginia Department of Transportation. February 4, 2020.
  9. ^ Natalie Stickel (March 30, 2020). "Monumental Ashland to Petersburg Trail Already Gaining Momentum". Riverside Outfitters.